The seawater discharge project of the Yulong Island Integrated Refining and Chemical Project (Phase I)
case

The seawater discharge project of the Yulong Island Integrated Refining and Chemical Project (Phase I)

2025-08-25

132 (2).png
3 (3).png
3 (4).png
3 (1).png
The project is constructed in an underground form. The drainage pipes are fixed-length wound circular fiberglass pipes, produced with CHEMPOLY ® brand H1001N and K-1001N resins, with pipe diameters of DN3200, DN2200, etc. The planned drainage capacity is approximately 740,000 square meters per hour.