The seawater discharge project of the Yulong Island Integrated Refining and Chemical Project (Phase I)
2025-08-25




The project is constructed in an underground form. The drainage pipes are fixed-length wound circular fiberglass pipes, produced with CHEMPOLY ® brand H1001N and K-1001N resins, with pipe diameters of DN3200, DN2200, etc. The planned drainage capacity is approximately 740,000 square meters per hour.